Product evidence

ProjectNexus Enterprise in action

A capability-by-capability walkthrough of the platform on synthetic data — project management, collaboration between organisations, controlled documents, architecture and BIM, delivery records, quantities and commercial administration, and AI that stays under professional review. Each capability is labelled Available, Demonstration or In development.

Synthetic project PNX-DEMO-2026-014Kijichi Civic Centre — Phase 2 · stage: Construction / Delivery · not a real project, client or site.

One platform across the project lifecycle

A synthetic project carried through every implemented stage — the same record set feeds management, documents, design, delivery, commercial administration and reporting.

Available
  • Tender / procurementAvailable
  • Design & BIMAvailable
  • Project setupAvailable
  • Construction / deliveryAvailable
  • Commercial administrationAvailable
  • Documentation & recordsAvailable
  • Completion / handoverIn development

In the workflow: Each tab below opens one capability area. Architecture Studio is one of them, not the whole platform.

Project control cockpit

Contract, money, time and exception position computed from the project's own records rather than typed into a report.

Available
Revised contract
TZS 8,762,500,000
incl. approved variations
Certified to date
TZS 4,720,000,000
TZS 540,000,000 outstanding
Completion
3/19/2027
28 days EOT approved
Delivery progress
54%
milestones and tasks

In the workflow: Every figure links back to the certificate, variation, instruction or task it came from.

Claims and what backs them

One integrated platform, not a drawing tool

Project management, collaboration, documents, design, delivery, quantities, commercial administration and AI assistance share one record set. Architecture Studio is one capability within it.

Drawings are derived, not drawn twice

The plan, elevation, section and 3D view in the Architecture & BIM tab are generated from one model in your browser. Nothing is a picture; every line is computed.

Measurement traces back to geometry

The quantities table is produced by the same engine that produced the drawings, and each line records the model objects it was measured from.

Contract administration is a governed workflow

Payment certificates, variations, extension-of-time claims, RFIs and instructions move through defined review and approval chains, each step time-stamped and attributed.

Organizations stay isolated

Tenant separation is enforced in the database with row-level security and role-based permissions, so participation in a shared project never exposes internal records.

AI output is advisory and reviewable

AI-assisted proposals are validated against the model and must be confirmed by an authorised professional. Every AI contribution is labelled as such.

Documents are controlled

Versioning, revision history, controlled approval and traceable distribution apply to issued documents, which carry the issuing organization's identity.

What this page deliberately does not show

No customer project, tenant record, document, drawing or figure appears anywhere on this site. The demonstration model is invented for the purpose. Access to the platform itself requires an account within a registered organization.

Evaluating the platform

Organizations evaluating ProjectNexus Enterprise can register and set up a project with their own team, or contact us to walk through contract administration, procurement and reporting against a scenario that matches how they actually deliver work.